DATA CENTRE CASE

CTG Tseung Kwan O TKO1 Data Centre Security Integration

Coordinating security equipment, network capacity, system configuration and on-site delivery to the critical-environment standards of a data centre.

CTG Tseung Kwan O Data Centre project

Project Background

ZONNET took part in the CTG Tseung Kwan O TKO1 data centre security integration project. The data centre needed to coordinate multiple systems, devices and teams without interrupting day-to-day operations.

Security Systems and Network Capacity

The project brought front-end security equipment, network connectivity, the management platform and on-site conditions into a single delivery framework, ensuring that device positions, capacity, permissions and equipment configurations matched one another.

Brand and Local Delivery Collaboration

ZONNET combined branded products such as Hikvision with local technical services, assisting with equipment selection, supply, installation, configuration and system commissioning — closing the distance between brand capability and the actual project.

Engineering Management for Critical Environments

Data centre projects demand rigorous documentation, change control, testing and site discipline. ZONNET supported phased completion of the project through clear responsibility boundaries and acceptance procedures.

Planning a data centre security integration?

Share your project scope, existing platforms, equipment requirements and site conditions, and we can define the work packages together.

Discuss a project