Project Background
ZONNET maintains a project partnership with China Mobile Hong Kong and took part in works related to the Fo Tan data centre. The environment must run stably over long periods, with equipment, networks and maintenance procedures kept clearly in order.
Network and Redundancy Design
The solution planned network paths around core equipment, uplink connections and site capacity requirements, reducing the impact of any single point of failure on services and reserving connectivity for future expansion.
Equipment Status and Operations Visibility
Centralised monitoring of device connectivity, alarms and basic running status helps operations staff locate the source of anomalies faster, without searching back and forth across separate systems.
Integration and Delivery
ZONNET placed equipment supply, configuration, network integration, on-site coordination and technical support within a single delivery process, giving each work package clear responsibility and acceptance criteria.