SMART CAMPUS

One campus network for teaching, campus life, security and IoT devices.

Bringing wired, wireless and IoT networks into a single planning framework, so student and staff access, teaching applications, video security and facility management each have clear boundaries.

Smart campus and teaching network scenario

Not everyone on the same network — every type of user on the right service.

Classrooms, libraries, dormitories, offices, public spaces and outdoor areas differ in density and purpose. The solution builds access and permissions around students and staff, visitors, devices and administrators.

  • IdentityUnified authentication with network and application permissions assigned by role
  • CoverageWired and wireless access designed for high-density classrooms, dormitories and public areas
  • SecurityIntegrated video, access control, alarms and campus network transport
  • OperationsCentralised management of devices, capacity, faults and multi-site campus configuration

Wired, wireless and IoT — three networks working together.

Each network layer does different work but shares the same identity, security and operations principles.

WIRED

Wired Network

Carries teaching, offices, equipment rooms and fixed devices with a stable, segmented backbone.

WIRELESS

Wireless Network

Handles high-density access, cross-zone roaming, guest services and multi-device management.

IOT

IoT Devices

Connects environmental, energy, door-lock and facility terminals while retaining device identity and permissions.

SECURITY

Campus Security

Integrates video, access control and event management to support multi-role collaboration and tracking.

City University of Hong Kong Hikvision project
City University of Hong Kong Hikvision project: supporting campus scenarios with site surveys, network transport and security integration.

Connecting brand equipment, campus environments and local delivery.

As a Hikvision solution partner, ZONNET helps small and mid-sized projects complete requirement mapping, equipment selection, network transport and on-site coordination.

  • Campus location and legacy system surveys
  • Video network, permission and storage planning
  • Equipment configuration, deployment and system commissioning
  • Documentation handover and follow-up technical support

View project details

Phased upgrades that minimise disruption to teaching and administration.

Address the backbone and high-risk areas first, then schedule the remaining cutover by building, purpose or academic term.

STEP 01

Campus Audit

Confirm buildings, users, terminals and systems.

STEP 02

Zoning Design

Plan networks, identity, permissions and capacity.

STEP 03

Staged Deployment

Schedule works and cutover around the academic calendar.

STEP 04

Ongoing Operations

Establish device, alarm and capacity management processes.

Planning a campus network or security upgrade?

Share your campus scope, building uses, existing equipment and key issues — we can help order the upgrade sequence first.

Discuss a Project